Request for Proposal

New Practice Field – Spokane Indians
Spokane Indians
602 North Havana Street, Spokane, WA 99202
(509) 535-2922 PROJ598 – Nov. 2012

TABLE OF CONTENTS

1. INSTRUCTIONS TO BIDDERS 3 1.1. General Description of Work 3 1.2. What Must Be Included with Bid 3 1.3. Schedule of Bid Period Activities 3 1.4. Location of Work 4 1.5. Pre-Bid Meeting 4 1.6. Owner Contact for Questions 4 1.7. Pre-Award Surveys 4 1.8. Sealed Bid Requirements 4 1.9. Basis for Bid Evaluation 4 1.10. Ethical Standards 4 1.11. Responsibility for Surety Bonds 4 1.12. Proposal Format 4 1.13. List of Bidders 4 1.14. Letter of Acknowledgment 4
2. DESCRIPTION OF WORK 5 2.1. Engineering Contracts 5 2.2. Construction Contracts 5
3. PROPOSAL 5 3.1. Breakdown of Bid Price 5 3.2. Revisions and Extra Work 5 3.3. Escalation Formulas 5 3.4. Scheduled Completion Dates 5 3.5. List of Subcontractors 5 3.6. Key Supplier or Contractor Personnel 5 3.7. Length of Time Bid Is Valid 5 3.8. List of Bid Document Addenda Reviewed by Bidder 5 3.9. Notice of Conflicts or Errors in Bid Documents 5 3.10. Clarifications of Bids 5 3.11. Bidder Signature 5
4. SPECIFICATIONS AND DRAWINGS 5
5. SPECIAL CONDITIONS 5
6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 5
Appendix A 6
Appendix B 8
Supplier/Bidder List 8

1. INSTRUCTIONS TO BIDDERS
1.1. General Description of Work
This proposal is intended to provide an insight to bidders regarding the physical development and blueprints of the new “Spokane Indians Practice Field.” Spokane Indians wishes to have a 20 acre site designed for a medium size baseball practice field. The new practice ball park will be located next to the existing softball stadium on Havana Street. The site is to be accessible to the existing park via one vehicular street with side walk for pedestrian…...

Similar Documents

Premium Essay

Ballpark Construction

... A New Practice Field Joliet Slammers 1 Mayor Art Schultz Dr, Joliet, IL 60432 Rebekah Clerk Rebekah.clerk@gmail.com PM598 – Jul 2012 TABLE OF CONTENTS 1. INSTRUCTIONS TO BIDDERS 9 1.1. General Description of Work 9 1.2. What Must Be Included with Bid 9 1.3. Schedule of Bid Period Activities 9 1.4. Location of Work 10 1.5. Pre-Bid Meeting 10 1.6. Owner Contact for Questions 10 1.7. Pre-Award Surveys 10 1.8. Sealed Bid Requirements 10 1.9. Basis for Bid Evaluation 11 1.10. Ethical Standards 11 1.11. Responsibility for Surety Bonds 11 1.12. Proposal Format 11 1.13. List of Bidders 11 1.14. Letter of Acknowledgment 11 2. DESCRIPTION OF WORK 12 2.1. Engineering Contracts 12 2.2. Construction Contracts 13 3. PROPOSAL 13 3.1. Breakdown of Bid Price 14 3.2. Revisions and Extra Work 14 3.3. Escalation Formulas 14 3.4. Scheduled Completion Dates 14 3.5. List of Subcontractors 14 3.6. Key Supplier or Contractor Personnel 14 3.7. Length of Time Bid Is Valid 14 3.8. List of Bid Document Addenda Reviewed by Bidder 14 3.9. Notice of Conflicts or Errors in Bid Documents 14 3.10. Clarifications of Bids 15 3.11. Bidder Signature 15 4. SPECIFICATIONS AND DRAWINGS 15 5. SPECIAL CONDITIONS 15 6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 16 Appendix A 17 Appendix B 18 Supplier/Bidder List 18 1. INSTRUCTIONS TO BIDDERS 1.1. General Description of Work The Joliet Slammers are soliciting bids for the construction of a new practice field. The new practice will be......

Words: 742 - Pages: 3

Premium Essay

Copy

...Request for Proposal An Inventory Control System The Beauty Bar 4257 Pixley Pritchard Rd; Timberlake, NC 27583 315-278-8799 Cheryl Thaxton Cheryl.thaxton@afghan.swa.army.mil PM598 TABLE OF CONTENTS 1. INSTRUCTIONS TO BIDDERS 4 1.1. General Description of Work 4 1.2. What Must Be Included with Bid 4 1.3. Schedule of Bid Period Activities 4 1.4. Location of Work 4   1. INSTRUCTIONS TO BIDDERS 1.1. General Description of Work Contractor shall provide a solution to supply outages and delays of tracking system. The current tracking system is still in the design stage. Contractor must have a minimum of 5 years experience in Inventory and design. Excellent verbal and written skills are a must. Must be successful at building & maintaining productive customer relationships and excellent internet knowledge and acquired web skills. Contractor shall provide all personnel and supervision necessary to perform services. Cheryl: Good but I need background info on your company and your company’s strategic objectives. This is important in order to provide complete picture of your company’s culture and business objectives. Need an in-depth description of the work so that the sellers would understand exactly what you want and how you want it. This is very basic to convey and shape your expectations and that of the sellers 1.2. What Must Be Included with Bid To properly evaluate the bid proposals when they are received, all of the......

Words: 600 - Pages: 3

Free Essay

You Decide Week 5 Project Pm598

...You Decide Week 5 Project PM598 – May/June 2012 Session It is always difficult to terminate a business, especially after you have invested so much time, effort and money in the company.  What makes it even more complex is going into business with others whom you expected to help the business succeed, yet it does not end up that way.  For this case scenario, Chris and Pat Smith, and the two chefs, J. P. Martin and L. L. Miller, need to get together to make some tough decisions on potentially dissolving the business At Your Service. Chris and Pat Smith want to dissolve the business, but Miller is asking to have the business transferred to her and Martin.  Assuming Chris and Pat Smith agree to transfer At Your Service to Martin and Miller, and Martin and Miller continue to run the catering business the following issues would need to be resolved: ·        How the $15,000 left in the investment would be split. ·        How to handle the lease on the rented space, which has 18 months more to run. ·        How to handle the lease for the van, which has 18 months more to run. ·        How to handle the lease on for the kitchen equipment, which as six months more to run. Chris and Pat Smith, and Martin and Miller decided it was best to have a termination contact set in place to secure all partakers in their final decisions.  They noted it was best for all to have precise, clear explanations all of all essential fundamentals for the termination of their business......

Words: 992 - Pages: 4

Premium Essay

Request for Rfp Pp1

...Request for Proposals Field of Dreams Dean Project Management (DPM) 3625 W Royal Ln., Houston, TX 77062 September 2013 Contract and Procurement Mgmt-4/2/2013 TABLE OF CONTENTS 1. INSTRUCTIONS TO BIDDERS 3 1.1. General Description of Work 3 1.2. What Must Be Included with Bid 4 1.3. Schedule of Bid Period Activities 4 1.4. Location of Work 10 1.5. Pre-Bid Meeting 10 1.6. Owner Contact for Questions 10 1.7. Pre-Award Surveys 10 1.8. Sealed Bid Requirements 10 1.9. Basis for Bid Evaluation 11 1.10. Ethical Standards 11 1.11. Responsibility for Surety Bonds 11 1.12. Proposal Format 11 1.13. List of Bidders 11 1.14. Letter of Acknowledgment 11 2. DESCRIPTION OF WORK 12 2.1. Engineering Contracts 12 2.2. Construction Contracts 13 3. PROPOSAL 13 3.1. Breakdown of Bid Price 14 3.2. Revisions and Extra Work 14 3.3. Escalation Formulas 14 3.4. Scheduled Completion Dates 14 3.5. List of Subcontractors 14 3.6. Key Supplier or Contractor Personnel 14 3.7. Length of Time Bid Is Valid 14 3.8. List of Bid Document Addenda Reviewed by Bidder 14 3.9. Notice of Conflicts or Errors in Bid Documents 14 3.10. Clarifications of Bids 15 3.11. Bidder Signature 15 4. SPECIFICATIONS AND DRAWINGS 15 5. SPECIAL CONDITIONS 15 6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 16 Appendix A 17 Appendix B 18 Supplier/Bidder List 18 ...

Words: 879 - Pages: 4

Free Essay

Pm598 Rfp

...PM598 – Go Green Consulting’s RFP 2010 Go Green Consulting’s Headquarters Go Green Consulting 13591 SE Sunnyside Rd Clackamas, OR 97015 Telephone: 503.432.5864 E-mail: tnbackes@me.com Wikispaces: http://gogreenconsulting.wikispaces.com Tara Backes, Mandalyn Echols, Raj Rami PM598 – Fall 2010 Pg 1 of 14 PM598 – Go Green Consulting’s RFP 2010 TABLE OF CONTENTS 1. INSTRUCTIONS TO BIDDERS............................................................................................................3 1.1. General Description of Work..............................................................................................................3 1.2. What Must Be Included with Bid .......................................................................................................3 1.3. Schedule of Bid Period Activities.......................................................................................................3 1.4. Location of Work ................................................................................................................................3 1.5. Pre-Bid Meeting..................................................................................................................................4 1.6. Owner Contact for Questions..............................................................................................................4 1.7. Pre-Award Surveys ...........................................................................................

Words: 4241 - Pages: 17

Free Essay

1234

...4 Cash Flow Statement of the PepsiCo [pic] Appendix 5 [pic] References: Allison Heiland, Angela Heyroth, Robin Tieman 2001, ‘Analysis of the Accounting Policies of PepsiCo as compared to Coca Cola’, pp1-12. Aziz Hassanali, Rami Musa & Jordan Rubin 2001, ‘Analysis of Pepsico’, pp1-12. Baldwin, E. & Khurana, R. 2012, ‘PepsiCo, performance with purpose,Achieving the right global balance’, Harvard Business School.pp 1-22. Liu, Y.F, 2012, ‘The Competition between Pepsico and Coca Cola’.pp1-25 Wang, S.A, 2009, ‘ Market Research Report of Pepsico’.pp1- 3 Jeff Williams 2012, ‘Profitability Analysis of PepsiCo’, Seeking Alpha. PEPSICO 2010, ‘Performance with purposes- The promise of PepsiCo’, pp1-110. PepsiCo, 2011, ‘The power of PepsiCo’, Annual Report 2011, pp 1-92. PepsiCo, 2009, ‘Our business risks’, Annual report 2009, The United Nations New York 2011, ‘World Economic Situation and Prospects 2012 Global Economic Outlook’, pp.1-42. Yach,D. Lucio, A & Barroso,C. 2007, ’Can food and beverage companies help improve population health? Some insights from PepsiCo’,The World Today, pp, 656-657. Zhou, Z.G, 2010, ‘ Market Analysis and Forecast About Pepsico’.pp1-4...

Words: 3091 - Pages: 13

Free Essay

Kettle Mountain Mining

...the world economy. During the past three months, the price has ranged from $ 11.5000 to $ 14.0000 per gram. S2 can be sold after electrolysis for $ 0.1533 per gram or it can be further purified. Purification costs are $ 0.0433 per gram of pure S2 (PS2) produced, which can be sold for $ 0.2000 per gram (both the $ 0.1533 and $ 0.2000 prices have remained relatively stable during the past year and management expects no significant changes during the next year). This purification process reduces the volume of the S2 product by 20%. (1 unit of S2 = 0.80 unit of PS2) The P1 can be sold after electrolysis for $ 14.3333 per gram or further purified and sold as PP1 for $ 18.3333 per gram. Purification results in a 10% reduction in the volume (1 unit of P1 = 0.90 units of PP1). The total cost of purification is $ 1.6200 per gram of PP1. During the winter, food and supplies are brought to the mine and the town of Carlsbad from Whitehorse on a winter road built over the frozen tundra and lakes. Whitehorse is KMM's closest link to a railway line. Once the supply trucks are emptied, processed minerals are loaded for shipment to outside markets. The total cost of winter road transportation was 2 million dollars 2011. This cost was split equally between KMM and the residents of Carlsbad. During the spring, summer and fall periods, all shipments between Whitehorse and the mine site have to be made by float plane and helicopter. KMM spent a total of 3.5 million dollars on these flights during...

Words: 1653 - Pages: 7

Premium Essay

National Budget

... 4. The simple circular flow model shows that: A) households are on the buying side of both product and resource markets. B) businesses are on the selling side of both product and resource markets. C) households are on the selling side of the resource market and on the buying side of the product market. D) businesses are on the buying side of the product market and on the selling side of the resource market. Use the following to answer question 5: [pic] 5. Refer to the above diagram. An improvement in technology will: A) shift the production possibilities curve from PP1 to PP2. B) shift the production possibilities curve from PP2 to PP1. C) move the economy from A to C along PP1. D) move the economy from A, B, or C on PP1 to D. 6. Which of the following is assumed in constructing a typical production possibilities curve? A) the economy is using its resources inefficiently. B) resources are perfectly shiftable among alternative uses. C) production technology is fixed. D) the economy is engaging in international trade. 7. A country can achieve some combination of goods outside its production possibilities curve by: A) idling some of its resources. B) specializing and engaging in international trade. C) buying the debt (bonds and stocks) of foreign nations. ...

Words: 1819 - Pages: 8

Premium Essay

Week 5 Sd1340

... Have a member of each group write their code on the whiteboard. Built-In Objects EXPLORE ACTIVITY 4: BUILT-IN OBJECTS In-Class Activity Ungraded Course Support Tools/Resources required for this activity: Unit 5 PowerPoint Presentation (SD1340.U5.PP1) Unit5Sample2.html (SD1340.U5.AF2) Description: Use Slides 22 through 32 to discuss built-in objects. Students have already been introduced to the Array, String, and Math built-in objects. Use Slides 22 and 23 to show how a built-in object can be extended. Use Slides 24-26 to explore the Math object. Unit5Sample2.html (SD1340.U5.AF2) illustrates how random numbers are chosen, by generating a group of numbers and then calculating their average. An average of 0.5 indicates a random distribution. You can run the code more than once to show how the results differ. Slide 27 explains how you can use the “with” keyword to reduce the amount of typing. Use Slides 28-32 to discuss the Date object. Estimated Time: 20 minutes conditional statements EXPLORE ACTIVITY 5: CONDITIONAL STATEMENTS In-Class Activity Ungraded Course Support Tools/Resources required for this activity: Unit 5 PowerPoint Presentation (SD1340.U5.PP1) Unit5Sample3.html (SD1340.U5.AF3) timegreet.js (SD1340.U5.AF7) Description: Use Slides 33 through 40 to discuss conditional statements. Students are examining conditional statements and logical operators in PT1420, Introduction to Programming, during this......

Words: 1297 - Pages: 6

Premium Essay

Tylenol Murders

... I think the only other avenue I would have pursued may have been the use of free samples. Today the news and information would have been more quickly disbursed and widespread in moments rather than over a few days. It could have created more problems, forcing decisions to be made more quickly and under more pressure. In the instantaneous world we live in, the information would have been available to many across the world and could have cause more panic, more money spent in recalls and recovery, and unfortunately more copy cat killers. References Burnard, Philip (1997), Effective communication skills for health professionals. Retrieved from http://books.google.com/books?id=QsyOBNdxzi4C&lpg=PP1&dq=effective%20commu nication%20skills%20for%20health%20professionals&pg=PP1#v=onepage&q&f=false...

Words: 584 - Pages: 3

Free Essay

Risk Assesment

...PM598 – Contract and Procurement Management PEACH COMPUTER COMPANY Case Analysis At the meeting, the decision was made to utilize detailed design and engineering specifications so as to obtain competitive bids on the project. The executive committee required completion of the building within twelve months since the new facility would allow for production necessary to meet a new government contract. The contract was of vital importance to Peach since it would yield additional net income of $4,000,000 annually. Within 2 months after the meeting, Don issued a request for proposal using the recommended specification method with a specific construction time of 9 months. Four proposals were received. Don reviewed them quickly since he had 3 weeks to award the project and execute a contract. Winstrom Construction was a local Ohio firm that had completed much of the construction at Wright-Patterson Air Force Base. They submitted a bid of $5,960,000 with a required deposit of $1,000,000. Winstrom had worked previously on a similar project for Peach and had finished it on-time. Don was concerned with the deposit given that Peach would have to supply these funds from capital reserves which were invested at 8% annually, but he rated their quality an A since he heard they had a partnership attitude in dealing with the inevitable problems on the AFB projects. Frazier Construction was a firm from Florida who had completed several projects around the country for competitors of......

Words: 498 - Pages: 2

Premium Essay

Gm545 - Project Part 1 - 2011

...Course Project - Part 1 This course contains two project assignments -- Project Part 1 in Week 2, and Project Part 2 in Week 5. Because of this, you will need to spend additional time and effort in Weeks 2 and Week 5. |Overview | | | | | Project Part 1 (PP1) Project Part 1 (PP1) consists of performing application-oriented exercises wherein the specific economic principles learned in this course are put to practical use. You must translate your ideas into economic analysis using the specific economic theory and economic terms contained in the TCOs covered in the course, and demonstrate that you are understanding and utilizing material from text chapters covered up to this point in the course, to receive full credit on the assignment. You are being asked to submit a report containing responses to three exercises. Exercise 1 entails a choice of one topical microeconomic issue out of two possible alternatives. Exercises 2 and 3 entail a choice of two textbook questions out of a list of possible alternatives. |Exercise 1 | | | | ...

Words: 1382 - Pages: 6

Premium Essay

Essay1

...bThe course project for PM598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. The points assigned to each part of the Course Project are listed below: |Course Project Assignment |Due |Points | |Part I (PP1) - RFP Section 1 |Week 2 |40 | |Part II (PP2) - Complete RFP |Week 4 |125 | |Part III (PP3) - Formal Proposal Submission |Week 6 |125 | |Total | ...

Words: 1270 - Pages: 6

Premium Essay

Pm 598

... | | The course project for PM598 consists of three parts, which provide familiarization to processes associated with Contract and Procurement Management.  • Part 1 (PP1) of the course project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP Template document in the Doc Sharing area to develop information to support section one of the RFP.  • Part 1 (PP2) of the course project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor.  • Part 3 (PP3) of the course project entails selecting one of the three case studies from the PP3 - Course Project Case Study document in the Doc Sharing area and answering questions that demonstrate an understanding of the Garrett text. The deliverable for PP3 is a seven-page document that addresses each of the questions specified for the case study selected. This three-part project provides an overview of the processes and material that is used to develop a RFP as well as address relevant questions that could result from Contract and Procurement management.  The points assigned to each part of the course project are listed below: |Course Project Assignment |  Due |Points | |    Course Project Part 1 (PP1) |Week 2 |40 | |    Course Project Part 2 (PP2) ...

Words: 2420 - Pages: 10

Premium Essay

Monetary Policy

...country’s unemployment rate. The Bank of Japan (BOJ) adopted, the approach of pursuing monetary easing by, changing the overnight rate to around 0 per cent to 0.1 per cent and injecting 55 trillion yen to purchase Japanese government bonds (BOJ, 2011, pp.1). Reduce the overnight rate will increase the money supply in banking system as it encourage banks to borrow money from Central Bank. Thus, other than a reduction in interest rates on loan and deposit accounts in bank, there will also be a lack of incentives for households to save, which therefore, encourages them to spend. Furthermore, an overnight rate between 0 percent and 0.1 percent is as good as free to the ordinary man, according to the Globe and Mail newspaper. (Carl Mortished, 2011, pp1) To accelerate the process, BOJ introduced additional 5 trillion yen from 50 trillion yen to purchase the government bonds. This adds up to a total amount of 55 trillion yen (BOJ, 2011, pp3). BOJ combated deflation with additional 5 trillion yen through the purchase of other financial assets as corporate bonds, commercial paper, real estate funds or anything that can inject cash into the economy. (Carl Mortished, 2011, pp2) In brief, expansionary monetary policy is an approach that stimulates the economy of the country. Its importance tool was highlighted in the case of Japan where it was employed by the BOJ to stimulate the economy to combat Japan’s current issue of deflation. 2.2 Contractionary Monetary Policy A......

Words: 3702 - Pages: 15